祁東煤礦1.2 Mta新井設(shè)計含5張CAD圖.zip
祁東煤礦1.2 Mta新井設(shè)計含5張CAD圖.zip,祁東煤礦1.2,Mta新井設(shè)計含5張CAD圖,祁東,煤礦,1.2,Mta,設(shè)計,CAD
任務(wù)書
題目:祁東煤礦1.2 Mt/a新井設(shè)計
專題題目:煤礦深井巷道礦壓顯現(xiàn)及其控制
主要內(nèi)容和要求:
以實習(xí)礦井祁東煤礦條件為基礎(chǔ),完成祁東煤礦1.2Mt/a新井設(shè)計。主要內(nèi)容包括:礦井概況、礦井工作制度及設(shè)計生產(chǎn)能力、井田開拓、首采區(qū)設(shè)計、采煤方法、礦井通風系統(tǒng)、礦井運輸提升等。
結(jié)合煤礦生產(chǎn)前沿及礦井設(shè)計情況,撰寫一篇關(guān)于煤礦深井巷道礦壓顯現(xiàn)及其控制的專題論文。
完成2010年《國際巖石力學(xué)與采礦科學(xué)雜志》上與采礦有關(guān)的科技論文翻譯一篇,題目為“Coal pillar load calculation by pressure arch theory and near field extraction ratio”,論文20781字符。
摘 要
本設(shè)計包括三部分:一般部分、專題部分和翻譯部分。
一般部分為祁東煤礦1.2 Mt/a新井設(shè)計,共分十章:礦井概述及井田地質(zhì)特征,井田境界和儲量,礦井工作制度、設(shè)計生產(chǎn)能力及服務(wù)年限,井田開拓,采區(qū)巷道布置,采煤方法,井下運輸,礦井提升,礦井通風及礦井基本技術(shù)經(jīng)濟指標。
位于安徽省宿州市東南,距離市中心20km。礦區(qū)對外交通便利。區(qū)內(nèi)地勢較為平坦,井田走向長度約9 km,傾斜方向長約4 km。面積為23.16 km2。井田主采煤層為 煤層,厚度平均為4.70 m。煤層傾角平均為14°,屬于緩斜煤層。
井田工業(yè)儲量為157.6 Mt,礦井可采儲量92.4 Mt。礦井服務(wù)年限為55 a,礦井正常涌水量為437.06,最大涌水量為586.10。礦井為高瓦斯礦井,礦井是突出礦井。
祁東煤礦礦井工作制度為“三八”制,一個綜采工作面保產(chǎn)。開拓方式為立井暗斜井延伸兩水平,水平標高分別為-650 m,-900 m,準備方式為采區(qū)巷道布置。礦井主井采用箕斗提煤,副井采用罐籠作為輔助提升。工作面采用長壁采煤法,面長180 m,采煤工藝為綜采。礦井主運輸為膠帶運輸,輔助運輸采用架線電機車牽引1.5 t固定式礦車運輸。礦井通風采用采區(qū)式通風。
針對南二采區(qū)采用了采區(qū)準備方式,共劃分11個區(qū)段工作面,并進行了運煤、通風、運料、排矸、供電系統(tǒng)設(shè)計。
專題部分題目是煤礦深井巷道礦壓顯現(xiàn)及其控制研究。論文以相關(guān)工程測試結(jié)合目前理論研究,進行了詳實的礦壓顯現(xiàn)觀測數(shù)據(jù)收集與整理,給出了深井軟巖巷道的變形收斂規(guī)律,結(jié)合規(guī)律提出了控制的建議,對礦井生產(chǎn)實踐具有顯著的指導(dǎo)意義。
翻譯部分對壓力拱理論結(jié)合回采率進行房柱式開采中計算支柱荷載進行了介紹,其英文題目為Coal pillar load calculation by pressure arch theory and near field extraction ratio。
關(guān)鍵詞:祁東礦井;雙立井;采區(qū)布置;綜采大采高;采區(qū)式;軟巖巷道;礦壓顯現(xiàn)
Abstract
This design contains three parts:the general part,the special part and the translated part.
The general part is a new design of Qi Dong coal mine located in southeast of Suzhou whose production capacity is 1.2 Mt per year.It has ten chapters as follows:the outline of mine and mine field geology, boundary and reserves, working system and productive capacity and service life, development method of the mine, the main roadways, coal mining method and layout or roadways in working area,transportation of underground, mine lifting, mine ventilation and safety, main technique—economic induces.
The QI Dong mine filed lies in the north of J southeast of Suzhou about 20 kilometers.The transportation is convenient and.It covers 23.16 square kilometers. The boundary of the minefield run 9 kilometers on the strike and the pitch length is 4 kilometers. Three is the main coal seam,its dip angle is 14 degree and thickness is about 4.70m on average.
The proved reserves of the minefield are 157.6 million tons,and the recoverable reserves are 92.4 million tons. The designed productive capacity is 1.2 million tons percent year, and the service life of the mine is 55 years. The normal flow of the mine is 437.06m3 percent hour and the max flow of the mine is 586.10m3 percent hour. The mineral well gas gushes is high, It is a high gas mineral well.
The working system is “three-eight”.One productive place meets the requirement. The mode of development this design uses a duel-vertical shaft and inclined shaft two-level development method. The mine has two levels, the first level locates in the level of –650 meters, the second in the level of –900 meters.The main shaft uses skip hoisting and the auxiliary shaft adopts cage hoisting. The working face adopts long wall retreating to the strike.Its length is 180 meters.The technology of the working face is the full-mechanized mining.Belt Conveyor to transit coal is used chiefly to transport coal, the auxiliary transportation uses 1.5t solid car. Districts ventilation is used for Xu Chang coal mine.
The design applies strip preparation against the first district of South Two which divided into 11 districts totally, and conducted coal conveyance, ventilation, gangue conveyance and electricity designing.
The monographic study entitled " Pressure behavior and control of deep mine ", with the theoretical research related engineering test, conducted a detailed pressure observation data collection and processing, gave the deformation and convergence law of soft rock roadway,with law we can recommend some control measures which really have a important influence.
The english topic of translation part is Coal pillar load calculation by pressure arch theory and near field extraction ratio.
Keywords:Qidong coal mine; double vertical shaft; district mode; full-height coal caving; districts ventilation; soft rock roadway; pressure observatin
收藏
編號:5183946
類型:共享資源
大?。?span id="24d9guoke414" class="font-tahoma">5.10MB
格式:ZIP
上傳時間:2020-01-17
50
積分
- 關(guān) 鍵 詞:
-
祁東煤礦1.2
Mta新井設(shè)計含5張CAD圖
祁東
煤礦
1.2
Mta
設(shè)計
CAD
- 資源描述:
-
祁東煤礦1.2 Mta新井設(shè)計含5張CAD圖.zip,祁東煤礦1.2,Mta新井設(shè)計含5張CAD圖,祁東,煤礦,1.2,Mta,設(shè)計,CAD
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。